SC-NUR provides the following services:
For wellhead equipment:- Preparation of wellhead equipment for installation on a well, checking its completeness, including documentation (hydraulic test reports, passports, etc.).
- Preparation for installation of all sealing elements (cup, packer, seal, etc.), checking all sizes and suitability for installation.
- Preparation for the installation of the slip hanger, checking that all dimensions are correct and suitable for installation.
- Preparation for installation of the tubing hanger, checking the compliance of all sizes and suitability for installation.
- Support of installation of wellhead equipment casing.
- Installation of slip hanger.
- Installation of sealing elements (cuff, packer, seal) into wellhead equipment housings.
- Support of installation/dismantling of tubing ang casing hanger.
- Preparation for assembly of the flange connection (cleaning, including paint removal) and its assembly.
- Hydraulic testing of interpacker spaces, of tubing ang casing hanger passages, seals.
- In the event of an emergency situation and/or deviation of equipment or column parameters from normal, providing consultation to adjust the design and/or using sealing devices of a different design, as well as consultation with the manufacturer.
- Support of installation/dismantling of the protective sleeve.
- Support of installation/dismantling of the crimp plug.
- Drawing up reports of completed work.
- Drawing up reports on the hydraulic testing of equipment performed.
- Coordination, together with the customer, of necessary changes and additions to the design of equipment and/or its configuration.
- Participation in working commissions to identify defects, causes of malfunctions and non-compliance of supplied equipment with quality requirements.
- Measuring pressure in the annular space.
For hydraulic control systems:
- Supervised installation/launch.
- Diagnostics.
- Unit repair.
- Carrying out routine periodic work.

